Large-volume storage
Confirm usable capacity, diameter, height, site footprint and connection requirements before the tank configuration is finalized.
Large capacity round bolted steel tanks with a factory fused glass coating for municipal, industrial and process water storage.
Glass fused to steel tanks combine structural steel with a factory fused glass coating and are commonly considered for larger municipal, industrial and process storage projects. Capacity, stored liquid, coating suitability, site footprint and project specification should be reviewed together.
Municipal water, process water, wastewater, industrial storage, infrastructure and larger fire water tanks.
For larger bolted steel storage, the main decisions usually involve usable capacity, available footprint, stored liquid, coating system, foundation interface, freight and long-term inspection requirements.
Confirm usable capacity, diameter, height, site footprint and connection requirements before the tank configuration is finalized.
The selected fused-glass system should be checked against the stored liquid, operating environment and manufacturer technical data.
Supporting structure, unloading access, panel handling, erection method and site logistics should be coordinated early for larger systems.
Final suitability should be confirmed against the project specification and the current technical data for the selected tank system.
Core material information sits directly on the product page so buyers and engineers can review the system without digging through a document library.
Formal project submittals from Panel Tank Supply can include the controlled manufacturer datasheet, certificates, drawings and installation information for the exact tank being supplied.
Panel Tank Supply brochure covering large-capacity glass fused to steel bolted tanks, factory-coated panels, applications, design considerations and project inputs.
Overview of the GRP / FRP, stainless steel, galvanized steel and glass fused to steel tank systems available through Panel Tank Supply, with selection guidance by project duty.