Mining and infrastructure water tanks
Civil, utilities, mining and remote project water storage.

Start with the application, not the material
Durability, freight, site logistics, documentation and larger capacity requirements normally lead the selection process. Material and coating suitability should be checked against the stored liquid and project environment.
Information to confirm before quotation
- Required usable capacity and any minimum reserve.
- Maximum footprint, preferred height and available assembly clearance.
- Stored water or liquid and any water-quality requirements.
- Inlet, outlet, overflow, drain and other connection requirements.
- Indoor or outdoor location, project ZIP code and site access.
- Project specification, drawings and required certifications.
Systems to compare for this application
These are the main panel tank technologies to review for this application. Final suitability should be confirmed against the project specification, stored water, environment and selected supplier data.

Galvanized steel panel water tanks
Heavy duty modular galvanized steel tanks for fire water, industrial, agricultural and infrastructure storage where strength, scale and value are important project drivers.
VIEW PRODUCT →
Glass fused to steel water tanks
Large capacity round bolted steel tanks with a factory fused glass coating for municipal, industrial and process water storage.
VIEW PRODUCT →Useful topics before quotation
Have a tank project to price?
Send us the project details and we will get the quote moving.